Lane & Skillen Ltd completed a large-scale refuelling station upgrade at Mildenhall Air Base, focusing on durability, environmental protection, and long-term performance. The project involved the full removal of an existing refuelling pad and surrounding roadways, followed by the installation of a specialist concrete system designed to safely manage fuel exposure and drainage.
The existing refuelling area had become outdated and unsuitable for modern operational and environmental standards.
Key issues included:
Additionally, the site required strict compliance with safety and environmental regulations due to the nature of aviation fuel handling.
Lane & Skillen Ltd carried out a full excavation of the old refuelling pad and access roads, preparing the site for a complete replacement system.
The installation included:
All elements were carefully designed to ensure durability, compliance, and operational efficiency.
The completed refuelling station now provides a robust, compliant, and environmentally responsible solution.
Benefits include:
The upgraded facility is fully equipped to handle demanding operational requirements while meeting strict environmental standards.
Specialist concrete installations for refuelling and industrial environments are essential where hazardous materials are involved. Proper containment systems, anti-corrosive materials, and engineered drainage solutions help prevent contamination, reduce long-term costs, and ensure compliance with regulations.
Lane & Skillen Ltd regularly undertakes large-scale groundworks and concrete installation projects in Mildenhall and surrounding areas including Bury St Edmunds, Newmarket, Thetford, and across Suffolk. Each project is tailored to site requirements, ensuring long-lasting and compliant results.