Project Overview

Lane & Skillen Ltd completed a large-scale refuelling station upgrade at Mildenhall Air Base, focusing on durability, environmental protection, and long-term performance. The project involved the full removal of an existing refuelling pad and surrounding roadways, followed by the installation of a specialist concrete system designed to safely manage fuel exposure and drainage.

The Challenge

The existing refuelling area had become outdated and unsuitable for modern operational and environmental standards.
Key issues included:

  • Worn and deteriorating concrete surfaces
  • Lack of appropriate fuel containment measures
  • Risk of jet fuel contamination entering drainage systems
  • Requirement for large-scale excavation and reinstatement

Additionally, the site required strict compliance with safety and environmental regulations due to the nature of aviation fuel handling.

The Solution

Lane & Skillen Ltd carried out a full excavation of the old refuelling pad and access roads, preparing the site for a complete replacement system.

The installation included:

  • A new reinforced concrete refuelling pad built for heavy-duty use
  • Anti-corrosive drainage systems to safely handle fuel exposure
  • A fuel containment bund, designed to capture any spills for safe disposal
  • Installation of a 70-metre soakaway system for controlled water management
  • New security fencing and access gateways
  • Full landscaping and site reinstatement to complete the project

All elements were carefully designed to ensure durability, compliance, and operational efficiency.

The Result

The completed refuelling station now provides a robust, compliant, and environmentally responsible solution.

Benefits include:

  • Improved safety and spill containment
  • Enhanced surface durability for heavy vehicle traffic
  • Reliable drainage and environmental protection systems
  • Clean, professional site appearance
  • Long-term low maintenance performance

The upgraded facility is fully equipped to handle demanding operational requirements while meeting strict environmental standards.

Why Choose This Type of Service

Specialist concrete installations for refuelling and industrial environments are essential where hazardous materials are involved. Proper containment systems, anti-corrosive materials, and engineered drainage solutions help prevent contamination, reduce long-term costs, and ensure compliance with regulations.

Local Area Coverage

Lane & Skillen Ltd regularly undertakes large-scale groundworks and concrete installation projects in Mildenhall and surrounding areas including Bury St Edmunds, Newmarket, Thetford, and across Suffolk. Each project is tailored to site requirements, ensuring long-lasting and compliant results.

Facebook
X
LinkedIn
Lane & Skillen Ltd
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.